Pages

Sunday, October 27, 2024

Roof

Mounted condensation stopper foil and stringers for the roof skin. That was a whole lot of work, and it had to be done while balancing up there, trying not to fall down. Completely battered today :-) One of my sons came and helped.



Wednesday, October 23, 2024

The structure is coming up

The (wooden) structure arrived. The main blocks was raised this weekend, with lots of help from my 3 sons. It would be impossible without them due to the sheer weight alone. One of them is a wooden boat builder, which helped a lot. He came all the way from Fredrikstad.

The wooden structure is a partly pre-fabbed thing from Lundqvist in Sweden. So far, very satisfied.






Insulation must also be done on the outside to prevent the cold from creeping in during cold winter months.



One of my sons got himself a Honda Africa Twin the weekend before. He also "sacrificed" the whole weekend helping out, instead of riding his new bike. The prospect of having a warm and dry place for his bikes in the winter was just too tempting I guess :-) He also has a smaller Honda, a CL 500.