Pages

Sunday, October 20, 2013

Hardware from ACS and elevator

The hardware from ACS arrived. Left everything in their small bags, but sorted the bags. Continued on the elevators. It was a lot of measurements and drilling in this area, but the measures on the drawings are logical and correct with proper datum, so it is fairly easy (not like the -4 where everything is floating and with drawings out of scale). I'm not totally sure how the hinges and everything will add up in the end, so I hope the drawings are correct, and I left the root ribs still undrilled.




No comments:

Post a Comment