Onex build log
An online log of the making of a Onex experimental aircraft
Showing posts with label
match-drill
.
Show all posts
Showing posts with label
match-drill
.
Show all posts
Tuesday, November 12, 2013
Match drilled all the holes in the h-stab skin
I left the elevators on to be sure they fitted after the match-drilling.
Older Posts
Home
View mobile version
Subscribe to:
Posts (Atom)