Onex build log
An online log of the making of a Onex experimental aircraft
Monday, June 27, 2016
Windshield and fwd bow
I was a bit fast riveting on the firewall windshield strip. Drill out all the rivets and installed screw and nuts (from Airward). Also trimmed the windshield, only the aft bow left, and all the holes.
Sunday, June 26, 2016
Windshield
Started with the windshield. Lots of trimming to get this right. The inspector was also here last Sunday. All OK.
Monday, June 13, 2016
New brackets for the wind shield
Sunday, June 12, 2016
Left Wing
Finished dimpling and deburring the left outer wing and skin
Sunday, June 05, 2016
Left Wing
Drilled all the 3/8 holes including the aileron hinge
Thursday, June 02, 2016
More left wing
Left Wing
Skinning of left wing
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)