The hardware from ACS arrived. Left everything in their small bags, but sorted the bags. Continued on the elevators. It was a lot of measurements and drilling in this area, but the measures on the drawings are logical and correct with proper datum, so it is fairly easy (not like the -4 where everything is floating and with drawings out of scale). I'm not totally sure how the hinges and everything will add up in the end, so I hope the drawings are correct, and I left the root ribs still undrilled.